In deze les zitten 20 slides, met interactieve quizzen en tekstslides.
Onderdelen in deze les
Slide 1 - Tekstslide
MORE FORMAL:
-May I interrupt you? Mr. Balwick is on the line.
-Thank you. Tell him I'll be right with him.
Interruptions
FORMAL:
-Excuse me, Paul... I have a question.
-Yes, Charles?
-Could you tell us how much these changes will affect the advertising budget?
-Certainly. I'll go into that in just a minute.
INFORMAL:
-Excuse me, Peter... am I interrupting you?
-Not at all, Ed. Come in. What's on your mind?
Slide 2 - Tekstslide
Graphs, charts
Slide 3 - Tekstslide
Describe the trends and movements of the following graphs!
Slide 4 - Tekstslide
Slide 5 - Tekstslide
Slide 6 - Tekstslide
Slide 7 - Tekstslide
Choose the correct answer!
Slide 8 - Tekstslide
During our last meeting, we developed a good _________.
A
acting plan
B
action plan
C
act plan
D
acted plan
Slide 9 - Quizvraag
I have a problem with the _________ of some of these action items. I think that we should rearrange the order a little.
A
sequel
B
section
C
sequence
D
second
Slide 10 - Quizvraag
_________ limit project options. If, for instance, you have "resource __________", you are limited in the resources you can use for a project.
A
contracts
B
contacts
C
constraints
D
constants
Slide 11 - Quizvraag
Will we outsource this task? No, we're doing it __________.
A
in-house
B
on-house
C
on-line
D
at-home
Slide 12 - Quizvraag
How's the project going? It's going well, but we're a little _________.
A
behind schedule
B
behind the schedule
C
behind time
D
behind the times
Slide 13 - Quizvraag
A ____, or "____ time" refers to the time after one project/activity is finished and before another one starts. This is often used in a negative way in reference to time lost because of projects that are behind schedule.
A
lad
B
lab
C
late
D
lag
Slide 14 - Quizvraag
It's rare that a project goes exactly as ______. Things often take longer than anticipated.
A
plane
B
plan
C
planned
D
on the plan
Slide 15 - Quizvraag
How long is the estimated ______? = How long do you think the project will last?
A
project duration
B
project schedule
C
project time
D
project pace
Slide 16 - Quizvraag
We hired a _________ to help us with this phase of the project.
A
consultation
B
consultant
C
consent
D
con
Slide 17 - Quizvraag
My boss enrolled our ______ in a training class next weekend.