Slide 1 - Tekstslide

Deze slide heeft geen instructies

Learning Objectives
  • Understand the significance of the Belfast Transport Hub project
  • Describe the features of the Belfast Transport Hub
  • Understand the roles of different parties involved in the Belfast Transport Hub project

Slide 2 - Tekstslide

Deze slide heeft geen instructies

What do you already know about the Belfast Transport Hub project?

Slide 3 - Woordweb

Deze slide heeft geen instructies

Overview of the Belfast Transport Hub project
  • A multi-modal transport facility
  • Replacing existing bus and rail stations
  • Joint venture of Farrans and Sacyr

Slide 4 - Tekstslide

Deze slide heeft geen instructies

Features and benefits of the Belfast Transport Hub
  • 26 bus stands
  • 8 railway platforms
  • Enhanced walking and cycling connectivity

Slide 5 - Tekstslide

Deze slide heeft geen instructies

Roles and responsibilities of different parties involved in the project
  • Farrans and Sacyr as main constructors
  • Weavers Cross development for economic growth and urban regeneration

Slide 6 - Tekstslide

Deze slide heeft geen instructies

Expected economic and social impacts of the project
  • Annual footfall of over 20M
  • Creation of over 500 jobs
  • Boost to construction and engineering sector in Northern Ireland

Slide 7 - Tekstslide

Deze slide heeft geen instructies

Definitions
  • Belfast Transport Hub: A multi-modal transport facility set to replace the existing Europa and Great Victoria Street bus and rail stations
  • Weavers Cross development: A part of the Belfast Transport Hub project aimed at facilitating economic growth and urban regeneration
  • Joint venture of Farrans and Sacyr: The main constructors of the Belfast Transport Hub project
  • Enabling works: Preliminary construction activities that are necessary before the main construction begins

Slide 8 - Tekstslide

Deze slide heeft geen instructies

Write down 3 things you learned in this lesson.

Slide 9 - Open vraag

Have students enter three things they learned in this lesson. With this they can indicate their own learning efficiency of this lesson.
Write down 2 things you want to know more about.

Slide 10 - Open vraag

Here, students enter two things they would like to know more about. This not only increases involvement, but also gives them more ownership.
Ask 1 question about something you haven't quite understood yet.

Slide 11 - Open vraag

The students indicate here (in question form) with which part of the material they still have difficulty. For the teacher, this not only provides insight into the extent to which the students understand/master the material, but also a good starting point for the next lesson.