Kitchen Renovation lesson 2

(kitchen) renovation VOCABULARY
PAPER & PEN
1 / 11
suivant
Slide 1: Diapositive
EngelsMBOStudiejaar 2,3

Cette leçon contient 11 diapositives, avec diapositives de texte.

Éléments de cette leçon

(kitchen) renovation VOCABULARY
PAPER & PEN

Slide 1 - Diapositive

1. Our kitchen is too small. We need to ________ it.
                                                                                                                    expand
                                                                                                                    increase
2. Sorry about the mess! We're in the middle of ________.
                                                                                                                    improvement
                                                                                                                    renovations
3. We have to ________ these tiles; they are old and dirty.
                                                                                                                    review
                                                                                                                    replace
4. I asked the contractor to give me an ________
(= a rough idea of how much the work will cost).
                                                                                                                     estimate
                                                                                                                     answer
5. We bought the new house because our old house was too small. We needed more _______.
                                                                                                                     room
                                                                                                                     area

Slide 2 - Diapositive

6. We had to ________ down (= to get rid of) the wall.
                                                                                                                      destroy
                                                                                                                      break/take
7. It looks like it's about 300 ________ feet right now.
                                                                                                                      square
                                                                                                                      cubed
8. We'd like to ________ the size of this room.
                                                                                                                      make twice
                                                                                                                      double
9. There are __________ (= people hired on contract to do a certain job) for each phase of construction: heating, electrical, plumbing, air conditioning, etc.
                                                                                                                       containers
                                                                                                                       contractors
10. Sometimes it's hard for contractors to find the exact materials that the __________ wants.                                                                                                             client
                                                                                                                       employee


Slide 3 - Diapositive

1. Our kitchen is too small. We need to expand it.                                    2. Sorry about the mess! We're in the middle of renovations.
3. We have to replace these tiles; they are old and dirty.
4. I asked the contractor to give me an estimate.
5. We bought the new house because our old house was too small. We needed more room.
6. We had to break/ take down (= to get rid of) the wall.
7. It looks like it's about 300 square feet right now.
8. We'd like to double the size of this room.
9. There are contractors for each phase of construction: heating, electrical, plumbing, air conditioning, etc.
10. Sometimes it's hard for contractors to find the exact materials that the client wants. 
                                                                                                                     
ANSWERS

Slide 4 - Diapositive

11. We are always ____________ with our clients. We don't hide anything from them.
                                                                                                                         upfront
                                                                                                                         ahead
12. When you paint your walls you can use either a paint brush, or a paint __________.
                                                                                                                         roll
                                                                                                                         roller
13. How many __________ ( = layers) of paint should I apply?
                                                                                                                         goats
                                                                                                                         coats
14. Many apartments have __________ floors.
                                                                                                                        hardwood
                                                                                                                        hard foot
15. A door sits on door __________.
                                                                                                                        hinges
                                                                                                                        hangars

Slide 5 - Diapositive

16. A __________ store is a good place to buy building materials.
                                                                                                                   software
                                                                                                                   hardware
17. These bathroom floor __________ are really old. We should replace them.
                                                                                                                   tiles
                                                                                                                   tools
18. They were supposed to finish last week, but they're a little behind __________.
                                                                                                                   timetable
                                                                                                                   schedule
19. I fixed your toilet. I also replaced your pipe at no __________ (= for free).
                                                                                                                   charge
                                                                                                                   charger
20. Can I get that estimate in __________?
                                                                                                                   print
                                                                                                                   writing

Slide 6 - Diapositive

11. We are always upfront with our clients. We don't hide anything from them.
12. When you paint your walls you can use either a paint brush, or a paint roller.
13. How many coats ( = layers) of paint should I apply?
14. Many apartments have hardwood floors.
15. A door sits on door hinges.
16. A hardware store is a good place to buy building materials.
17. These bathroom floor tiles are really old. We should replace them.
18. They were supposed to finish last week, but they're a little behind schedule.
19. I fixed your toilet. I also replaced your pipe at no charge (= for free).
20. Can I get that estimate in writing?
                                                                                                           

ANSWERS

Slide 7 - Diapositive

Complete each of the sentences below using the following words:
freezer, paper towels, knife, spoon, toaster, curtains, napkin, salad, refrigerator, oven

Slide 8 - Diapositive

ANSWERS:
freezer, paper towels, knife, spoon, toaster, curtains, napkin, salad, refrigerator, oven

Slide 9 - Diapositive

Complete each of the sentences below using the following words:
plate, microwave, mop, dishwasher, cutting board, blender, utensils, chair, rag, cupboard

Slide 10 - Diapositive

ANSWERS:
plate, microwave, mop, dishwasher, cutting board, blender, utensils, chair, rag, cupboard

Slide 11 - Diapositive