Your project group will carry out a number of activities. These will result in all sorts of intermediate results or 'products. An event such as the official opening of a building can be an intermediate result.
It is important to identify the result and to work towards it.
The result should be measurable.
Slide 6 - Diapositive
Examples intermediate results
A report (final report, interim report)
A construction drawing for a machine
A bus arriving at a school in time for a school outing
A mould for making plastic objects
An installed machine (such as a computer)
A training plan
A project plan
Slide 7 - Diapositive
What could be an intermediate result of your project?
Slide 8 - Question ouverte
Quality control
Deals with the quality of the end product (and all intermediate products). How can you guarantee their quality? Keep in mind that it is the sponsor who ultimately decides whether the quality of the end result of the project if sufficient.
Slide 9 - Diapositive
Quality control
Describe the desired quality of the end product. Also describe how the sponsor will access this quality after the project has been completed.
Indicate what checks will be carried out to guarantee the quality. These could include both test and technical procedures.
Slide 10 - Diapositive
Name a way in which you can control quality within your project?
Slide 11 - Question ouverte
Your next step
I need help with writing a section on intermediate results and quality control.
I am able to independently
I need a recap on intermediate results & quality control.
Slide 12 - Sondage
Working time
Write a section on intermediate results.
Write a section on quality control.
Each section should be between 100 - 200 words.
Use the internet if you need examples.
Finished? Continue with other English assignments.
timer
40:00
Slide 13 - Diapositive
Can describe all the words terms and phrases. Can write a section on intermediate results. Can write a section on quality control.