G10 Break Even Analysis

Tuesday, 21st of February 2023
1 / 35
next
Slide 1: Slide
Business StudiesSecondary Education

This lesson contains 35 slides, with interactive quizzes and text slides.

Items in this lesson

Tuesday, 21st of February 2023

Slide 1 - Slide

This item has no instructions

Slide 2 - Slide

This item has no instructions

Slide 3 - Slide

This item has no instructions

Slide 4 - Slide

This item has no instructions

Slide 5 - Slide

This item has no instructions

Slide 6 - Link

This item has no instructions

Slide 7 - Link

This item has no instructions

The total cost is all the money going out of a business.
A
true
B
false

Slide 8 - Quiz

This item has no instructions

The total revenue is all the money coming into the business.
A
true
B
false

Slide 9 - Quiz

This item has no instructions

If the total cost is less than total revenue, the business makes a ________.
A
profit
B
loss

Slide 10 - Quiz

This item has no instructions

If the total cost is more than total revenue, the business makes a _______.
A
profit
B
loss

Slide 11 - Quiz

This item has no instructions

Slide 12 - Slide

This item has no instructions

A business wants to have less total costs than total revenue.
A
true
B
false

Slide 13 - Quiz

This item has no instructions

Slide 14 - Slide

This item has no instructions

Slide 15 - Slide

This item has no instructions

Slide 16 - Slide

This item has no instructions

Slide 17 - Slide

This item has no instructions

Slide 18 - Slide

This item has no instructions

Building rent: 5300 AED
Electricity utility bill: 1590 AED
Water utility bill: 800 AED
Yearly website fee: 1350 AED
Delivery Fee: 750 AED
Materials to produce products: 13,000 AED

Slide 19 - Slide

This item has no instructions

Calculate the variable cost for January for AlHaramain.
Building rent: 5300 - Electricity: 1590
Water: 800 per month
Yearly website fee: 1350
Delivery Fee: 750 Dirhams per month
Materials to produce products: 13,000
A
16,140
B
17490
C
20,140
D
22,790

Slide 20 - Quiz

This item has no instructions

Slide 21 - Slide

This item has no instructions

Calculate the average cost for January for Al Haramain Perfumes.
Total Fixed Costs: 32,250
Total Variable Costs: 20,350
Total Output:5,500

A
9.06 AED
B
9.56 AED
C
9.65 AED

Slide 22 - Quiz

This item has no instructions

(Total variable cost/ Output)

Slide 23 - Slide

This item has no instructions

The Elegance Abaya factory in Ajman produced 1,000 abayas last month. The cost of raw materials was 12,000 AED, electricity (based on consumption) was 2,500 AED and hourly wages for workers were 4,500 AED. Other variable costs added up to 5,000 AED.
a) Calculate the total variable cost. b) Calculate the variable cost per unit.


timer
1:40

Slide 24 - Open question

This item has no instructions

Slide 25 - Slide

This item has no instructions

If fixed costs are: 32,250 Variable costs are: 20,350 and total output is 5,500. Calculate the variable cost per unit.
A
3.00 AED
B
3.70 AED
C
9.00 AED
D
9.56 AED

Slide 26 - Quiz

This item has no instructions

Slide 27 - Slide

This item has no instructions

Slide 28 - Slide

This item has no instructions

Slide 29 - Slide

This item has no instructions

Slide 30 - Slide

make a slide that has an activity to practice calculating the contribution per unit

Slide 31 - Slide

200

Slide 32 - Slide

This item has no instructions

Slide 33 - Link

This item has no instructions

Slide 34 - Slide

This item has no instructions

Slide 35 - Slide

This item has no instructions